Skip to content

BLACK WEEK only 00 : 00 : 00 : 00 - Shop the deals

-5% Deal Topseller
Grohe

Grohe StartEdge single-lever sink mixer, high spouts, projection 207mm, chrome

More
Item No. 30529001

76,16 € 80,17 €** You save 4,01 €

incl. 19% VAT in addition.
Shipping index: 3 Points

Delivery and Shipping Costs

We charge an additional flat-rate packaging and processing fee of:
9,75 € for parcel shipping
23,08 € for shipment by freight carrier

From an order value of 2.500,00 € you will receive the goods free of shipping costs within Germany.

Maximum shipping index *

Shipping costs incl. VAT. **

3

8,50 €

7

14,90 €

11

19,90 €

15

29,90 €

21

49,90 €

26

79,90 €

68

109,90 €

124

139,90 €

240

179,90 €

MAX

199,90 €

All shipping rates apply to mainland deliveries only. We only deliver to mainland destinations.
* The shipping index is used to calculate shipping costs. It corresponds to the item weight including the additional packaging material.

2 weeks
by parcel service
No processing costs
- +

Grohe StartEdge single-lever sink mixer, high spouts, projection 207mm, chrome

Grohe StartEdge single-lever sink mixer, high spouts, projection 207mm, chrome

Grohe StartEdge single-lever sink mixer, high spouts, projection 207mm, chrome

More

  • Grohe StartEdge
  • 1 x single-lever sink mixer
  • 1/2"
  • high spouts
  • projection 207 mm
  • height 332 mm
  • single-hole installation
  • Grohe StarLight surface
  • Grohe Longlife 28 mm ceramic cartridge
  • GROHE Zero separate internal water paths - no contact with lead or nickel inside the fittings
  • swivelling pipe spout
  • 360° swivelling range
  • Flexible connection hoses
  • GROHE QuickFix Plus Quick and easy installation - no tools required

Manufacturer:
GROHE Deutschland Vertriebs GmbH
Zur Porta 9
DE-32457 Porta Westfalica

Email:
helpline@grohe.de

*Non-binding price information provided by the manufacturers
**SHK Badshop price without additional discount
1 Free shipping within mainland Germany on orders of €2,500 or more.
2 In stock = delivery time approx. 2–3 working days